Page 16 of 16
2.60 Reviewing Associated Lists in the Technical Data Package (TDP)
2.60.1 Parts Lists (PLs) Reference ASME Y14.34M. Check the following:
- If separate PLs are used, make sure their format is correct.
- If separate PLs are used, ensure that the PL numbers are correct.
- If an integral PL is used, ensure that the format is correct. Ref ASME Y14 .34M.
- Ensure that part or identifying numbers are correct (including items controlled by military specifications).
- “Find numbers” or “reference designators” used on the PL must be consistent with those shown on associated drawings.
- PLs may be revised only in accordance with ASME Y14.35M.
- PLs must specify quantities wherever possible.
- Bulk items must be identified by a discrete identifier instead of quantity.
- Ensure that “as required” (AR) quantities are used only where appropriate.
- Items that are not adequately defined by a government or industry specification must be depicted in a control or other type drawing.
- Ensure that parts depicted on Vendor Item Control, Source Control, Altered Item and Selected Item drawings are properly identified per ASME Y14.100 and Appendix D.
- When PLs are produced on an automatic data processing system (ADPS), ensure that their format complies with ASME Y14.34M.
- Ensure that every item on a drawing is also on a PL.
- Verify that military and industry standard part numbers correctly identify the parts being used.
2.60.2 Data Lists (DLs). Reference ASME Y14.34M. Check the following:
- Ensure that the format is correct.
- Ensure that the DL contains all drawings, documents and associated lists.
- Ensure that DL numbers are correct.
- Ensure that the DL is revised per ASME Y14.35M.
- Ensure that documents are sequenced per ASME Y14.34M.
- Ensure that DLs are prepared for each major assembly, subassembly or unit as required.
- Ensure that DL nomenclature is consistent with that used on the assembly drawing.
2.60.3 Index Lists (ILs). Reference ASME Y14.34M. Check the following:
- Ensure the format is correct.
- Ensure that IL numbering is correct per ASME Y14.34M.
- Ensure that documents are sequenced per ASME Y14.34M.
- An IL must be prepared for each major assembly or system as required by the contractual instrument in effect.
- Ensure that each IL contains all applicable DLs and ILs.18
- Ensure that the nomenclatures on ILs agree with those on the assembly drawing.